- May 28, 2023Fortis was contracted to install six 25kV Feeder Cables in the Service Shaft. Fortis successfully completed the installation of three…
- May 28, 2023Fortis was commissioned to remove and replace the structural tower steel. The project was time critical as this shaft is…
- May 28, 2023Fortis successfully completed the loading pocket steel Installation. The scope of work included the supply and installation of tower steel…
- May 28, 2023Fortis successfully completed shaft remediation on the concrete shaft liner. Over time water began eroding the ground behind the concrete…
- May 28, 2023Fortis provided all manpower and equipment to install (2x) 13.8kv shaft feeder cables and associated instrumentation cables in No.2 shaft.…
- May 28, 2023Supplied personnel and equipment to assist with install of 54 electrical cables in a bus shaft project. Performed a top-down…
- May 28, 2023Fortis was commissioned to install 2 feeder cables, 2 ground cables, 2 fiber optic cable down two 8" boreholes 500…
- May 28, 2023All personnel and equipment to install shaft brackets/wedges and (2x) 15kv Prysmian Airguard 350 MCM shaft feeder cables were supplied…
- May 28, 2023Fortis supplied all personel and equipment to install new 15kv Prysmian Airguard 350MCM shaft feeder cables. It was Installed from…
- May 28, 2023Fortis was contracted by a client as a subcontractor to complete the replacement of the north shaft hoist ropes. Fortis’…