Feeder Cables

Service(s) Provided: Mine Shaft Maintenance & Repair

Fortis was contracted to install six 25kV Feeder Cables in the Service Shaft. Fortis successfully completed the installation of three cables in 2011 and the remaining three in July 2012. Fortis utilizes a cross head with integrated camera to guide the cable down the shaft to the lower drift level at the bottom of the shaft. The cross head is assembled in the shaft on top of the skip or cage. Camera provides live video of the cable being lowered down the shaft. Fortis is using a load cell to monitor the weight at the sheave.