Fortis was contracted to execute the furnishing of a shaft. This large-scale project included the pouring of a 480m concrete divider wall, installation of shaft services such as electrical cable, water lines, high pressure slurry lines as well steel sets and ridged guides in the shaft. Along with the furnishing scope of work, was to remove the existing Galloway system in the shaft and replace it with a service cage and counterweight for the clients day to day operations. This scope included the replacement of ropes on the double drum hoist along with the installation of a service cage and counterweight.